U-groove high-quality stainless steel profiles for pipe support structures

Product Detail

color:true colorInvoicing:by actual weight
grade:201/304/321/316/316L/310Splace of origin; place of origin:Aoyama/Flower Words
Surface treatment:No.1/No.3/No.4/HL/1D/8KPackage preview:
port:Shanghai, Qingdao Port, Tianjin Port, etc.Packaging Details:Plastic film inside, waterproof kraft paper outside, fixed with straps and pallets
Roll weight:2-9 tons or according to customer requirementsproduct name:stainless steel channel
Surface treatment:No.1/No.3/No.4/HL/1D/8KSupply capacity:20,000 tons/month
thickness:2.0mm-20mmtechnology:Hot rolling/welding/bending
brand:Aoyama/HOSSZPProcessing services:Bending, welding, punching, cutting
tolerant:±0.05mmPerforated or not:Not perforated
delivery time:within 7 daysPackage:Nylon bag, wooden frame, wire rope
MOQ:1payment terms:L/C, T/T
edge:trimmingstandard:Aisi
Steel grade:310S, 316L, 316, 321, 304shape:U/V/L groove, U groove
model:201/304/321/316/316L/310S/customized
Product Description
U-groove high-quality stainless steel profiles for pipe support structures
According to the processing technology, stainless steel channels are divided into hot-rolled stainless steel channels, welded stainless steel channels, and bent stainless steel channels.
detailed drawing
length
6M or any length
width
50mm*4.0mm thick-160mm*6.5mm thick
thickness
2.0mm-20mm
standard
AISI, ASTM, DIN, JIS, GB, JIS, SUS, EN, etc.
technology
Hot rolling/welding/bending
surface treatment
No.1/No.3/No.4/HL/1D/8K
Thickness Tolerance
±0.05mm
Material
201/304/321/316/316L/310S in stock, other models can be customized
application
It is widely used in beam-column components of industrial and civil building steel structures. steel structure load bearing
Support industry structure. Frame structures for ship and machine building. Steel piles and supporting structures
Underground engineering, etc.
MOQ
1
delivery time
1.200 tons: within 5 days after deposit
2. Customized size: within 10 days after deposit
3. OEM products: within 20 days after deposit
capacity
20,000 tons/month
Applications
VIEW MORE

Related Products